New Delhi : Indian Railways has achieved the main tunnel breakthrough of Tunnel-14, measuring 6.59 km, in the Rishikesh-Karnaprayag Rail Project today in Rudraprayag district of Uttarakhand. The breakthrough connects the two excavated sections of the tunnel, comprising 4.7 km from Portal-1 (Sumerpur) and 1.79 km from Portal-2 (Marora). At Portal-1 (T14P1), a 110-metre stretch […]